15.2 GB SQL Preserved
39 Fabrication Milestones
76-Tech Capacity Heatmap
QR Machine-Side Capture
01 · Operational Challenge

Why Legacy Tooling Bottlenecked Growth

Fabricating heavy heat exchangers, pressure vessels, and ductwork caused 24–48 hour shop-floor paper delays, OneDrive Excel locks, late budget-hour alerts, and unbalanced 48.1% overtime across 76 technicians.

Legacy Baseline:SapiERP (Access 2003) + 15.2 GB SQL Server + 21-Sheet .xlsm Macro Book
02 · Sapi Engineering Solution

Modern Cloud & Hardware Execution

Designed PIASA SmartFab Web Cloud preserving the 15.2 GB SQL Server database while adding a 39-milestone work-order cockpit, 3D CAD viewer, rugged tablet QR digital travelers, 80/90/100% labor burn alerts, and CNC Ikegai / crew heatmaps.

Modern Sapi Stack:React / Tailwind Web MES + Rugged QR Floor Tablets + SQL Server
SmartFab MESQR TravelersHeavy SteelCAD 3DSQL Server
Architecture Blueprint

How Legacy Data Flows Into Modern Operations

01 · Baseline
Existing Stack & Plant Floor
SapiERP (Access 2003) + 15.2 GB SQL Server + 21-Sheet .xlsm Macro Book
Mexico · Monterrey, NL
Heavy Steel & Industrial Mfg
02 · Parallel Bridge
Sapi SQL Parity & Hardware Layer
SmartFab MES
QR Travelers
Heavy Steel
CAD 3D
03 · Production
Modern Cloud & Mobile Experience
React / Tailwind Web MES + Rugged QR Floor Tablets + SQL Server
15.2 GB SQL Preserved
39 Fabrication Milestones
Vertical Practice

Heavy Steel, Automotive & Industrial Manufacturing

39-milestone work-order MES, QR shop-floor tablets, multi-plant 8D supplier quality, engineering BOM quoting, automotive EDI/ASN, SCADA & quarry scales.

Explore Industry Solutions

Productized Cloud SaaS Modules From This Domain

$449/mo

Sapi SmartFab MES™

Built for heavy steel fabrication, machining, and discrete manufacturing. Replaces Excel production sheets with QR-scanned floor travelers, 39-milestone critical paths, crew capacity heatmaps, and engineered BOM quoting.

Explore Module
$99/mo

Sapi Kaizen / HTP™

Multi-tenant plant improvement platform where operators submit cost-saving ideas, managers run 4D/8D corrective workflows, and finance verifies real dollar savings and profit-sharing rewards.

Explore Module
$149/mo

Sapi TimeClock & MotivBoard™

Rugged tablet RFID badge time clock engineered for cold rooms and plants with automated FLSA/weekly overtime rules paired with live shop-floor TV MotivBoards showing throughput, attendance, and shift targets.

Explore Module
← Previous Case StudyPlatinum MGANext Case Study →Streamline Insurance & Stream-X

Need Similar Results Without Halting Operations?

Talk directly with the architects behind these 100+ systems—starting with a zero-obligation review of your current database.